Substitute fuels (EBS) for thermal power plant in Rostock

Planning of a thermal power plant for thermal waste processing

Task

The system includes fuel delivery and storage areas, an EBS boiler with grate firing, a flue gas cleaning unit, an extraction condensing turbine with a closed water-steam circuit and an air-cooled condenser.

Technical data

  • Electrical capacity: 20 MW
  • Firing capacity: 98 MW 
  • team quantity: 100 t/h
  • Live steam parameter: 42 bar/ 405°C
  • EBS quantity: 180.000 t/a

Customer

Vattenfall Europe PowerConsult GmbH

Services

  • General planning including conceptual design and approval planning
  • tendering and contracting
  • controlling

Project period

from 2005 to 2009