Friedrich Loeffler Institute, Isle of Riems, complete project

Technical system planning for animal health

Task

With a total investment of approx. €290 million the Federal Republic of Germany developed the Friedrich Loeffler Institute - a national animal center - at the Isle of Riems. By 2013, the most modern laboratory and stable areas with different levels of safety from L2/S2 and L3/S3 to the highest level of L4vet/S3 and L4/S4 were built on the total construction area of approx. 60,000 m² (newly built area approx. 45,000 m²). In addition, several peripheral structures such as a cell bank, administrative buildings and a conference center were constructed.

The Isle of Riems has been developed into one of the world-leading locations for animal health research. The investment costs of the very demanding high-quality technical equipment for the entire complex reached approx. €120 million.

Canola oil powered CHP unit and a photovoltaic generator as renewable energy sources are in compliance with the requirements of the federal guidelines for sustainable building. In collaboration with Gruneco AG in Basel, BLS provided planning services for all technical systems.

 

Customer

General planner IttenBrechbühl/Partner Rauh Damm Stiller 

Services

  • Planning services in compliance with HOAI (German Fee Regulations for Object Planners and Engineers)
  • Phases 2-8 for all technical systems in the form of a ARGE (working community) with Gruneco AG, Basel

Project period

from 2005 to 2013