Planning of four boiler units including secondary systems in four different locations in output range from 1,500 to 2,000 kW to provide the basic heat load for existing heat supply systems, fuel A1 and A2, as well as natural wood.
Planning of four boiler units including secondary systems in four different locations in output range from 1,500 to 2,000 kW to provide the basic heat load for existing heat supply systems, fuel A1 and A2, as well as natural wood.
Harpen EKT
Technical system planning from basic evaluation to the project supervision (HOAI service phases 1 - 9)
from 2004 to 2005