Creation of the concept for the renovation of the cooling system for Tegel Airport with the focus on the investment decision: build or lease the chiller unit. Based on the resulting concept, planning services for a new compression refrigeration system (3.5 MW) to cover the basic load, and precautionary hydraulic-related measures for short-term integration of leased chillers to cover peak loads (up to 3.5 MW). For this, a significant planning focus was placed on linking the new system to the existing system and network from the 70s.
Tegel Airport
Expansion of the cooling system
Task
Customer
Berliner Flughafen Gesellschaft mbH
Services
Technical system planning from basic evaluation to the project supervision (HOAI service phases 1 - 8)
Project period
from 2010 to 2011