| |
|
| . |
| Energy and architectural consulting |
Below you find selected references from the field of Energy and architectural consulting.
|
| |
|
|
| . |
. |
. |
| |
|
Modernisation concept of the district heating network in Berlin-Gropiusstadt
The condition of the district heating network is being assessed and evaluated for a part of the city with 40,000 flats after more than 40 years in operation. Based on this evaluation, a modernisation concept was developed for the coming years. |
| Client |
GbR Fernwärme Gropiusstadt |
| Place / Period |
Berlin / 2006 |
|
| |
|
|
| . |
. |
. |
| |
|
Feasibility study on air conditioning and security engineering equipment of the Musée de l’Abbaye in Echternach
Assessment of an installed high-precision air-conditioning system to guarantee climate parameters (18-20°C, 50-55% relative humidity) required for the exhibition of historically valuable documents. Analysis of the security engineering. |
| Services |
Feasibility study
(technical/financial aspects) |
| Client |
Service des Sites et Monuments |
| Place / Period |
Echternach / 2005 |
|
| |
|
|
| . |
. |
. |
| |
|
Consulting services for the Ministry of Economic Affairs of the Grand Duchy of Luxembourg on the German CHP law
Economic feed-in tariffs for CHP electricity are being analysed for creating a new legal basis while taking into account the legal conditions of the Grand Duchy of Luxembourg. The study may serve as the basis for revising the laws on subsidies for CHP plants and renewable energy sources. |
| Services |
Energy supply concept |
| Client |
Le Gouverment du Grand-Duché de Luxembourg |
| Place / Period |
Luxemburg / 2005 |
|
| |
|
|
| . |
. |
. |
| |
|
Regulation of the permits for the EBBC complex in Luxembourg-Findel
Analysis of the approval conditions to be complied with in terms of energy production, presentation of alternatives for the energy production (combined heat and power, combined heat, power and cooling), coordination with the authorities. |
| Services |
Consulting |
| Client |
Atisreal Luxembourg |
| Place / Period |
Luxemburg / 2005 |
|
| |
|
|
| . |
. |
. |
| |
|
Comparative study on the position of the energy sources district heat and natural gas in the heat market of Berlin |
| Services |
Preparing a comparative study on the current and future position of the energy sources district heat and natural gas in the heat market of the City of Berlin. |
| Client |
GASAG, Berliner Gaswerke AG |
| Ort / Zeitraum |
Berlin / 2005 |
|
| |
|
|
| . |
. |
. |
| |
|
Study on determining the general conditions for using CHP plants from special points of view |
| Services |
Determining general conditions for the use of CHP plants of different sizes in terms of heat sales management as well as combined heat and power sales management. The assessment shows the potentials of an active power management for CHP customers (industry and business) while including the current legal basis. |
| Client |
GASAG, Berliner Gaswerke AG |
| Place / Period |
Berlin / 2005 |
|
| |
|
|
| . |
. |
. |
| |
|
Police department 5, Berlin Friedrichshain, survey report on the condition and replacement requirements of the building services installations |
| Services |
Preparing a survey report on the condition and replacement requirements of the building services installations in terms of conforming to standards, safety aspects and the general technical standards. |
| Client |
Chief of Police in Berlin, Property Management, Central Service Unit |
| Place / Period |
Berlin / 2005 |
|
| |
|
|
| . |
. |
. |
| |
|
Calculation of CO2 savings according to the German Energy Saving Ordinance (EnEV) |
| Services |
Preparing calculations according to the German Energy Saving Ordinance (EnEV) on achievable CO2 savings as a result of reducing the heating requirement. |
| Client |
GHG Wohnen GmbH, Berlin |
| Place / Period |
Berlin / 2005 |
|
| |
|
|
| . |
. |
. |
| |
|
Monitoring the introduction of the European emissions trading for the Messe Berlin GmbH
The consulting services include the support before the beginning of the trading period, at the beginning of the trading period as well as services on considering economic measures on CO2 savings. |
| Services |
Ongoing consulting services |
| Client |
Messe Berlin GmbH |
| Place / Period |
Berlin / 2004 |
|
| |
|
|
| . |
. |
. |
| |
|
Monitoring the condition of the technical equipment in the biosphere hall of the City of Potsdam
- Development of a monitoring handbook with quantitative and qualitative targets for ongoing and/or recurring monitoring activities for the technical systems to guarantee the status quo of the technical reliability
- Organisation of yearly recurring inspections of the technical systems
- Documentation, monitoring and evaluation of energy consumption and energy and water costs
|
| Services |
Concept and ongoing consulting services |
| Client |
Entwicklungsträger Bornstedter Feld GmbH, Potsdam |
| Place / Period |
Potsdam / 2004 |
|
| |
|
|
| . |
. |
. |
| |
|
Survey report on the effects of the German Energy Saving Ordinance (EnEV) for modernising residential buildings
Assessment of the buildings of three properties of the GEHAG GmbH and presentation of the effects of different supply systems for the refurbishment measures of the buildings. |
| Client |
GEHAG GmbH |
| Place / Period |
Berlin / 2004 |
|
| |
|
|
| . |
. |
. |
| |
|
Energy supply concept for the municipal hospital of Russe, Bulgaria
BLS Energieplan prepared an energy supply concept for the municipal hospital in Russe comprising the basic restructuring of energy supply, energy generation and distribution as well as qualifying and renewing the technical equipment. A considerable result was also a financing and implementation concept for the developed measures. |
| Services |
Energy supply concept |
| Client |
Municipal hospital of Russe, Bulgaria |
| Place / Period |
Russe, Bulgarien / 2004 |
|
| |
|
|
| . |
. |
. |
| |
|
Survey report on the cost-effectiveness of using different heat supply systems in single-family development areas in Potsdam
Preparing a survey report on the cost-effectiveness of using natural gas and district heat in the development area Gartenstadt Nord, in the area of the site Bornstedter Feld, in Potsdam. |
| Client |
Entwicklungsträger Bornstedter Feld GmbH |
| Place / Period |
Potsdam / 2003 |
|
| |
|
|
| . |
. |
. |
| |
|
Survey report on evaluating the energy supply concept for the construction project “German School in Geneva”
Assessment of the economic viability of an energy supply concept for a school building with large areas of glass in the facade and of the plausibility of the concept regarding comfort and energy efficiency.
|
| Client |
H.S. consult / German Federal Office for Construction Engineering and Regional Planning |
| Place / Period |
Genf / 2003 |
|
| |
|
|
| . |
. |
. |
| |
|
Analysis of the properties of the building society Ideal supplied by district heating
Negotiation of new energy supply contracts while presenting alternatives. |
| Services |
Analysis of the energy costs, negotiation of new supply conditions. |
| Client |
Building society Ideall |
| Place / Period |
Berlin / 2001 |
|
| |
|
|
| . |
. |
. |
| |
|
Energy concept for Gropiusstadt and contracting tendering for the heat supply
Preparing an energy concept for 55,000 residential units and analysing the existing supply via a 3-conductor system. Tendering for a CHP plant with a thermal capacity of 120MW for contracting. |
| Services |
Energy supply concept |
| Client |
GbR Gropiusstadt |
| Place / Period |
Berlin / 2000 bis 2001 |
|
| |
|
|
| . |
. |
. |
| |
|
District heating network for Gropiusstadt, thermal capacity approx. 150MW, analysis of the network condition and heat production costs
Recording the current situation and analysing the contractual, economic and technical data. Determining the heat production costs, tendering of the heat supply. |
| Services |
Status-quo analysis, economic analysis, valuation |
| Client |
Fernheizung Gropiusstadt GbR (comprising 21 building companies) |
| Place / Period |
Berlin / 2000 until 2001 |
|
| |
|
|
| . |
. |
. |
| |
|
Feasibility study on the construction of a waste incineration plant
Preparing a feasibility study on the thermal utilisation of highly caloric Stabilat waste from mechanical and biological treatment plants for municipal waste. |
| Services |
Energy consulting |
| Client |
Fernwärme Greifswald GmbH |
| Place / Period |
Berlin / 2000 |
|
| |
|
|
| . |
. |
. |
| . |
. |
. |
| . |
|
|
| |
|
|