Solar energy / Photovoltaik

Below you find selected references from the field
of Solar energy / Photovoltaik.

   
 
. . .
   
Photovoltaic generators of 3x22kWp for the new construction of the Friedrich Löffler Institute on the Isle of Riems, Mecklenburg-Western Pomerania
Installation of three horizontally aligned photovoltaic generators of amorphous thin-film silicon, integrated in the roof surfaces of barn buildings, forming a roof membrane. The peak capacity is 3x22kW under standard conditions. The module surface is approx. 1,050m².
Services Planning and construction supervision
Client General planner IttenBrechbühl / Rauh Damm Stiller Partner Greifswald
Place / Period Isle of Riems, Greifswald / 2005 until 2010
 
. . .
   
Photovoltaic generator of 25kWp for the construction of a laundry building in Züssow, Mecklenburg-Western Pomerania
Installation of a horizontally aligned photovoltaic generator of amorphous thin-film silicon, integrated in the roof surface of a laundry building, forming a roof membrane. The peak capacity is 25kW under standard conditions. The module surface is approx. 400 m².
Services Planning and construction supervision
Client Pommerscher Diakonieverein
Place / Period Züssow, Mecklenburg-Western Pomerania / 2005 until 2006

 

. . .
.  

Photovoltaic generator of 37kWp for the Peenemünde Museum
Installation of a horizontally aligned photovoltaic generator of amorphous thin-film silicon, integrated in the roof surface of a former power plant building, forming a roof membrane.
The peak capacity is 37kW under standard conditions.
The module surface is 590m².

Services Planning and construction supervision
Client Municipality of Peenemünde, Department of Karlshagen
Place / Period Peenemünde, Mecklenburg-Western Pomerania / 2004 until 2006

 

. . .
.  

Photovoltaic demonstration system Burg Klempenow
Installation of a photovoltaic demonstration system with 8kW peak for the castle Burg Klempenow.

Services Engineering
Client Kultur-Transit-96 e. V.
Place / Period Burg Klempenow / 2002 until 2003
 
. . .
.  

Photovoltaic demonstration system Vilmnitz (Baltic island of Rügen)
Installation of a 5.92kW peak photovoltaic demonstration system in Vilmnitz on the Baltic island of Rügen

Services Planning and construction supervision
Client Protestant church community of Vilmnitz / Rügen
Place / Period Vilmnitz / 2001 until 2002
 
. . .
.  

Photovoltaic demonstration system Nautineum Dänholm, Stralsund
Installation of a 1.7kW peak photovoltaic demonstration system for the Nautineum Dänholm

Services Planning and construction management.
Client Stralsunder Energieversorgung mbH (SEV)
Place / Period Stralsund / 2001
 
. . .
.  

Photovoltaic system on a school building in Lehnin (Brandenburg)
Installation of a photovoltaic system with 10kW peak on a school building in the municipality of Lehnin as part of the local agenda.

Services Planning and construction management
Client Gemeinde Lehnin
Place / Period Lehnin / 2000 until 2001
 
. . .
. . .
.  

Glass-roof integrated photovoltaic generator for the new construction of the Lehrter Bahnhof railway station in Berlin
A photovoltaic system with a total capacity of 189kW peak was integrated into the railway platform roof of glass, running from east to west.

Prize award: In May 2003, BLS Energieplan GmbH was awarded the John Bonda Prize, invited by the European Photovoltaic Industry Association (EPIA) on the occasion of the 3rd World Conference on Photovoltaic Energy Conversion (WCPEC-3) in Osaka (Japan) for the successful facade-integrated system.
Services BLS Energieplan was commissioned by Deutsche Bahn to carry out all services, ranging from the feasibility study to the concept, applying for subsidies as demonstration project within the solar thermal programme of the European Commission, coordinating the planning and construction period with the EU Commission, and providing engineering and construction supervision during HOAI work phases 2-9. Subsequently, BLS Energieplan was carrying out the monitoring for 2 years and has been commissioned by the Deutsche Bahn with operating the plant since June 2002.
Client Deutsche Bahn Station und Service AG
Place / Period Berlin, 1997 - 2004
 
. . .
.  
 
 
^
 